1 phase, 3×400 V + N or 3×230 V: what does it mean?

Your grid connection is a starting point for an EV charger and battery, not an afterthought.

Closed electrical distribution board and separate digital meter with cable conduits

In brief

One phase, 3×400 V + N and 3×230 V are different connections. Three phases do not automatically mean 400 volts with a neutral conductor. Pass the connection as it appears on your grid data. If in doubt we check this; do not just choose the most powerful option in an application.

Why this counts with an EV charger

The car, charging station and grid connection must be assessed together. The rating on the EV charger does not promise that your car will charge at that power at home. Other appliances also use electricity at the same time. Power management may form part of the design. Ask what charging speed is planned for your specific situation and whether the existing connection can be retained.

What does this mean for a battery?

With a battery proposal we check the inverter, battery voltage, measurement and desired operation as a whole. A proposal for 3×400 V + N shall not be applied unnoticed to 3×230 V. Another network or an adapted system structure may require other material or a separate assessment. Please also explain which functions may be limited.

Where do you find the right information?

Use available network documents or have the connection confirmed by your distribution system operator or installer. Never open the sealed meter or electric covers to search for yourself. In addition to the connection, note also the main security if it is reliably known. A possible adjustment by the distribution system operator is independent of the device choice and should be discussed in advance.

Sources & further reading

Official background to the technical explanation. Consulted on 17 September 2026. A manufacturer's source doesn't confirm that we supply that brand.

General decision guidance, not a technical inspection report or a personal return calculation. Your installation or garden requires a separate assessment.

View the related service