In brief
Please include the water inspection in your renovation or construction planning before completion. Among other things, the Flemish Environmental Company mentions new construction before commissioning, renovation of water installation and important changes as inspection moments. For your specific procedure, have it confirmed which inspection is necessary. Wattra can include the organisation in the agreed assignment; the official control and the certificate remain the work of a recognized inspector.
This explanation is part of & Remodel plumbing.
Describe the change, not just the name of the project
An application with only new bathroom... doesn't tell enough what changes to the water installation. Note which connecting points come up, which devices change and whether rainwater is used. Also mention later stages, such as a kitchen that is only placed after the move. With this description you can have the necessary inspection and the appropriate time recorded without having to determine the technical classification.
What documents are you preparing?
The Watergroep requests a signed inventory of the connected appliances and an implementation plan for the water installation. Therefore, collect device data, the available plans and information on the connections actually executed. Decide who compiles the file and completes missing data. A sales brochure or an old ground plan without updated installation data is not a replacement for the requested inspection documents.
When are you planning the appointment?
The state of the works must comply with the conditions of the examiner. The Watergroep describes which appliances must be placed and connected and what a later finish can mean for an additional inspection. Have those terms confirmed directly for your file. Therefore, not only on the basis of a provisional delivery date, but also notify changes in planning to the parties concerned in good time.
Who's doing what at the inspection?
Let in the quote name who applies for the appointment, who gives access and who can answer questions about the execution during the audit. Ask whether preparation, inspection costs and possible follow-up are counted separately. Wattra only organises what has been agreed on this and does not become the official inspection body. Keep the confirmation of the appointment with your project documents, so that a transfer between contacts does not cause any confusion.
What do you do with comments and the certificate?
Read the result together with the performer and agree who will follow up any comments. Keep track of repair work and any reinspection as separate follow-up steps. The control relates to the installation which the examiner was able to assess; do not assume that later placed appliances are automatically covered. Keep the final certificate and accompanying documents in a findable place for subsequent work.
Prepare the inspection organisation with Wattra
Send your municipality, a description of the sanitary works, the current construction phase and available documents. Please indicate whether an appointment or previous report already exists. Wattra discusses the sanitary implementation and the support to the inspection organisation in the proposal. You don't have to have a complete file to start the conversation; the purpose is precisely to make missing information and responsibilities visible in time.
Sources & further reading
Official background to the technical explanation. Consulted on 18 September 2026. A manufacturer's source doesn't confirm that we supply that brand.
General decision guidance, not a technical inspection report or a personal return calculation. Your installation or garden requires a separate assessment.
View the related service