Wattra · Knowledge centre

Electrical work: how do you compare quotes?

Compare electrical-work quotes for the same connection points, finishing, diagrams and inspection. Ask Wattra for a clear proposal for your project.

In brief

First compare which electrical works you get for the amount. Two offers are only comparable when spaces, connecting points, materials, preparatory works and finishing have the same meaning. A lower total price can be a smaller assignment. Request missing parts explicitly and have options set aside. Thus you can save on conscious choices, without leaving necessary works unnoticed from the comparison.

Looking for an overview? Comparing quotes: a checklist for each installation

Count the same points and name the execution

Mark one plan sockets, light points, switches and devices. Ask how a double socket is counted and whether light fittings are included or only the connection. For new power supply for a device, allow the full route to be assessed. A rule "electricity kitchen" says less than a described breakdown with numbers. Use the same version of the plan and the same desired switches for each request.

Separation installation and finishing

Ask who provides slots, holes and access to hidden pipes. Make a distinction between placing cables, closing slots and final plaster or painting finishes. Specify what should be retained and whether spaces are used during the works. Please also indicate which preparatory works have already been included by another contractor. This way you do not pay for unclear overlapping tasks and remain visible missing tasks.

Don't forget schematics and any checks

For household installations, the FPS Economy distinguishes between important and non-important changes. The documentation and control depends on the procedure. Ask which schedules or plans are updated and whether a check should be organised. Wattra does not carry out official inspections itself: a recognized inspection body performs the electrical inspection. Allow preparation, organisation and control costs to be recognised in the proposal.

Ask for clarity about price and changes

The FPS Economy emphasizes for renovation agreements information about the assignment, price and execution before you decide. Ask which total including applicable VAT you compare and which posts are provisional. Arrange how unexpected determinations and additional wishes are discussed before additional works start. Also note the validity period, payment moments and possible dependencies of other contractors. An oral idea is not yet a detailed multi-work assignment.

Ask for a proposal based on your real plans

Send Wattra your address, plan or sketch, some overview photos and your desired changes. If you have an inspection report, add it. You don't have to decide which security is necessary. We discuss electricity works for homes, companies and associations of co-owners throughout Flanders and make clear which execution, documents and further assessment are part of your application.

Sources & further reading

Official background to the technical explanation. Consulted on 18 September 2026. A manufacturer's source doesn't confirm that we supply that brand.

General decision guidance, not a technical inspection report or a personal return calculation. Your installation or garden requires a separate assessment.

View the related service

Advice about your project?

Tell us what work you need and send the documents you already have. We will discuss the assessment, work and price for your installation.