Charging two electric cars at home? Compare one or two charging points, parking time and power sharing. Discuss your driveway and connection with Wattra.

In brief

Having two electric cars does not automatically mean you need a higher-capacity grid connection or two charging points operating at maximum power. Start with how much charge both cars need and when they are at home. One shared charging point may suit you if you can take turns; two suitable charging points offer more convenience and can share the available power.

When will one charging point be sufficient?

If the cars do not need to charge at the same time and the cable safely reaches both parking spaces, taking turns to charge may be practical. Also think of the days when both cars come home late and leave early. A solution that only works on a quiet weekend day is not a good basis. Do not use any cable distributor to connect two vehicles to one charging outlet.

How do two charging points distribute the power?

In case of suitable load balancing, the available charge flow is distributed; if there is insufficient capacity, a car can wait. That's not the same thing as getting twice the maximum device power. In addition, Easee manufacturer documentation distinguishes between distribution at charging points and taking into account the other building consumption. That second function requires appropriate measurement and configuration. Not all charging point models can form a single group.

Which car gets power first?

Discuss whether both cars should be treated equally or one needs to be ready sooner. Not every system supports adjustable priority. The possibilities of the car, cable and grid connection also determine the actual charging speed. Ask for an explanation of what happens when communication fails. A design must fit the daily use, not just the number of parking spaces.

What do you pass on to Wattra?

Send the two vehicle models, your usual driving distances and parking times, a picture of the parking spaces and the data from an existing charging point. Please indicate whether loading costs for an employer should be registered separately. We then discuss connection, cabling, control and the desired version. Wattra deals with applications in the Waasland and all of Flanders; the quote makes clear what is now being placed and what may be prepared for later.

Sources & further reading

Official background to the technical explanation. Consulted on 18 September 2026. A manufacturer's source doesn't confirm that we supply that brand.

General decision guidance, not a technical inspection report or a personal return calculation. Your installation or garden requires a separate assessment.

View the related service

Advice about your EV charger?

Tell us what work you need and send the documents you already have. We will discuss the assessment, work and price for your installation.