Roof renovation with solar panels: plan the interim arrangements too

Temporarily removing solar panels for roof work? Coordinate removal, storage, reinstallation and documents before finalising the renovation.

By · managing director at Wattra · · 3 min read

The short answer

Plan a roof renovation with solar panels as one coordinated task with different performers. Not only arrange the new roof and final panels, but also secure decommission, temporary storage and control in case of relocation. Let us define responsibilities and costs separately. For example, it remains clear who acts when the roof is temporarily without a working installation.

Background

Practical renovation background, checked on 19 September 2026. This article does not report any new premium or roof rule from July 2026.

Solar panels on the roof of a home
In this article

The forgotten phase between withdrawal and repositioning

Your roofer can start, but who removes the solar panels? And where are they while the roof is open? That intermediate phase deserves a place in the planning. Otherwise, a clear roof sacrifice could result in an incomplete project budget.

Create a simple order with decision-making moments: technical recording, agreements between performers, safe decommissioning, roofing, relocation and control. Connect one responsible to each step. Also discuss what happens if the weather is disappointing or during the roofing work shows that the construction needs more attention than expected.

Have the roof condition assessed before solar panels

For older buildings, possible presence of asbestos is part of this preparation. OVAM prohibits the installation of solar panels on asbestos-containing roof coverings. For an asbestos-containing shelter, OVAM makes a specific distinction to damage in the case of placement. Therefore, let the concrete situation be assessed expertly.

Don't detach yourself to see what's underneath. A photo or supposed year of construction does not replace an appropriate assessment. Ask the roof manager what information is still missing and plan that investigation before you record the assembly. This prevents the solar panel team from discovering a fundamental uncertainty until the execution day.

Sources: OVAM asbestos roofs and facades

Describe what is stored and what is re-evaluated

Before dismantling, have the components present and visible condition documented. Decide who organises transportation and storage and how the panels and accessories are protected. Also ask who evaluates the parts before they are re-used.

Do not suppose that the old fixing fits the renewed roof. Let the professionals concerned assess the new situation and describe any replacements. If a component is damaged, you want to be able to find out whether it was already known and who decides on the next step. That's practical file management, not liability judgment.

Keep roofing and solar paneling separately visible

Ask for separate items for the relevant work and ask questions for an unclear overall package. In his tender checklist, VEKA stresses that the removal and return of solar panels should be stated separately and not qualify for My RenovationPremie. So don't automatically include that part as premium work.

See also what the quote says about additional movements, changed roof details and any modification of the installation. Ask before agreement how unforeseen work is discussed. This way you can follow the budget without hearing of any deviation until afterwards on the invoice.

Sources: VEKA . . clear offers for renovation works

Make the restart part of the handover

After the roof works, let them record which parts have been replaced or changed and what checks are required. Ask who evaluates whether schedules must be adjusted, testing or notifications. Do not compare the first cloudy day with an old sunny production day to assess the quality.

Discuss with Wattra the solar panel side of your renovation in Flanders and deliver the roof plan, the existing device data and the planned planning. We're adjusting the technical question to what changes on the roof. Roofings and possible asbestos assessment require their own competent performers; a solar panel proposal does not replace that assessment.

What you can prepare now

  • Also plan the period without working solar panels.
  • Have roof condition and possible asbestos demand assessed.
  • Arrange transport, custody and control.
  • Request separate posts for solar panel work.

Frequently asked questions

Can I disconnect the panels for the roofer myself?

Have electrical disassembly and safe decommission performed by the appropriate specialist. This article is a planning help, no instruction for roofing or detaching electrical connections.

Should all solar panels be replaced?

Not necessarily. Have the condition, new roof structure and technical suitability assessed. Ask for support per proposed replacement instead of relying on full re-use or renewal.

Sources & review

Consulted on 19 September 2026. Rules and tariffs may change. Check the source for the date and circumstances of your request.