Electrical work · Flanders

Expanding your electrical installation: when is an inspection needed?

An extra electrical circuit or a different distribution board? Discuss whether an inspection is needed and what it covers before work starts.

By · managing director at Wattra · · 4 min read

The short answer

Not every electrical procedure has the same effect. An inspection before commissioning is provided for an important modification or extension of a domestic installation; the FOD mentions an additional circuit as an example. Let the concrete assignment be assessed in advance. Wattra can coordinate the execution and planning and organise the independent inspection, but does not take over the decision of the examiner.

Background

Official explanation updated on 11 August 2026 and checked here on 19 September. A new date on the explaining page does not mean that every small repair will require an inspection.

Electrical amenities in different areas of a home
In this article

Call the procedure, not just the new device

You ask for a connection for a new device and think of a short visit. However, the extent of the electrical procedure is not only demonstrated by the device name. There may be an existing connection, a new circuit or a change to the distribution cabinet.

So, when you request the full plan: which device, where and what you know about the existing connection. A photo of the closed electrical enclosure and available schematics can help to start the conversation. Leave the further research to the professional; do not disassemble any parts to make the application more complete.

An important extension has its own control moment

The FPS Economy mentions the inspection before commissioning of a new installation or significant modification or extension in domestic installations. Adding a circuit on a distribution board is a mentioned example. A future periodic inspection is not a substitute for that control moment.

Ask in the preparation who determines which procedure fits, which part is checked and when the installation may be used. This way you avoid that the appointment for placement is fixed, but no one has included control in the planning. In case of doubt, let the performer and the inspection body coordinate.

Sources: FPS Economy — types of domestic electrical inspections, Flanders Electrical Installation Verification

Smaller changes do not disappear from the administration

For a non-important change, the FOD describes another regime: no new conformity inspection before commissioning, but a description in the file and modification of the installation layout plan. That classification is not an invitation to regard each small invoice as technically irrelevant.

Ask at your command which documentation will be modified and why. A client does not have to decide which category the work falls into. You can demand that the proposal be clear about the implementation, the data required and the follow-up. That distinction makes it easier to compare quotes with apparently identical equipment prices.

Sources: FOD Economy . . domestic installation, file and modifications

An existing report remains valuable information

Deliver an earlier inspection report completely, even when the planned expansion comes elsewhere in the home. Report previous remedial work and changes that are not yet found in the file. An executor has little insight into the original findings on a loose photograph of the conclusion.

For example, suppose you remodel a kitchen at the same time and want to have the electrical enclosure adjusted. Ask for a delineation of both work and the related checks. It is not wise to discover only after the kitchen installation that a document is missing or an electrical preparation should be performed otherwise.

Reserve room for control and possible follow-up

A placement date and an inspection appointment are two separate appointments. Discuss their order, who should be present and how comments are followed. A performer may prepare his work, but should not guarantee a favourable report from an independent party.

Wattra helps homes in Flanders with electrical modifications and can organise a recognized inspection body for the official inspection. Please indicate when you need the new device and what other works are planned. Then we discuss the feasible order, documentation and responsibilities before you count on an end date.

What you can prepare now

  • Describe new appliances and desired electrical changes.
  • Provide existing schedules and all pages of the report.
  • Discuss check and permission to use in advance.
  • Arrange documents, presence and follow-up of comments.

Frequently asked questions

Does every replaced socket need to be re-checked?

There is a distinction between important and non-important changes. Let the actual procedure be assessed; do not draw a general conclusion from only the product name or number of working hours.

Can Wattra officially approve the installation itself?

No. Wattra can carry out the work, prepare and organise the inspection. The recognized inspection body performs the independent control and prepares the official report.

Sources & review

Consulted on 19 September 2026. Rules and tariffs may change. Check the source for the date and circumstances of your request.