Adjusting electrical works to your new bathroom
The location of shower, bath, sink and furniture determines how to prepare the electricity. Wattra discusses lighting, operation, sockets and connections for the agreed devices. Deliver your bathroom plan and municipality, even when not every choice is set.
Review an existing installation
We look at the existing electrical facilities and what adjustments your layout requires. The correct location and implementation of connection points shall be assessed for the specific situation. Do not open any casings or electrical cabinets to gather information; existing diagrams and overview photos help with preparation.
You can also apply for plumbing at Wattra
Besides the electrical works Wattra also carries out sanitary renovations. Indicate whether water pipes, drains or sanitary fixations should be addressed. Both tasks and planning are clearly defined. Degradation, tiles, furniture and other architectural finishes are not automatically included; this is not a promise of a full bathroom renovation.
Planning, documentation and quote
We align the preparation and assembly with the other work. Your proposal makes clear which electrical works, any sanitary works and finishes are included. Required documentation and the organisation of any inspection shall be appointed. A recognized inspection body performs official control.

